# Renewable Energy Licensing Regulation 2026

> Qamarya is not a real country. The Sultanate of Qamarya, its institutions, officials, laws, figures and news are invented. This site is a demonstrator designed by Nordik.ai and GenerIA to show what a State portal can do with artificial intelligence, with a person behind every decision.

Defines the authorisation regime for renewable electricity generation according to installed capacity. It simplifies small self-consumption projects and…

- **Reference:** Ministerial Resolution No. 12/2026
- **Year:** 2026
- **Status:** in force
- **Ministry:** Ministry of Energy and Natural Resources

## Provisions

- Installations below 1 MW for self-consumption require only registration with the grid operator.
- Installations from 1 to 50 MW require a generation licence; installations above 50 MW are awarded as concessions by public tender.
- Every licence or concession application includes a grid connection study.
- Pre-approved land is available for solar projects in the Rimal Solar Development Zone.
- The licence fee is 2,000 QMR per MW of installed capacity, with a minimum of 500 QMR.

---
Page: https://qamarya.net/en/laws/REG-CORE-ENR · [Français](https://qamarya.net/fr/laws/REG-CORE-ENR.md) · [العربية](https://qamarya.net/ar/laws/REG-CORE-ENR.md)