# Rimal Solar Corridor phase 2 connected to the national grid

> Qamarya is not a real country. The Sultanate of Qamarya, its institutions, officials, laws, figures and news are invented. This site is a demonstrator designed by Nordik.ai and GenerIA to show what a State portal can do with artificial intelligence, with a person behind every decision.

1.1 GW of new solar capacity and 600 MWh of battery storage bring renewables to almost a third of Qamarya’s electricity.

- **Date:** 6 July 2026
- **Ministry:** Ministry of Energy and Natural Resources

The second phase of the Rimal Solar Corridor was connected to the national grid on 6 July 2026, adding 1.1 GW of photovoltaic capacity and 600 MWh of battery storage in the Rimal Solar Development Zone. Together with phase 1, the corridor now totals 2.2 GW of the 4.5 GW planned by 2030.

The new capacity raises the share of renewables in national electricity generation to around 31%, compared with 4% in 2018. A dedicated line also supplies the QSIP Rimal Campus, which now covers 85% of its annual consumption with solar power, on the way to 100% by 2030.

“The sun of Rimal now powers the intelligence of the State,” said H.E. Dr. Salim bin Rashid Al-Tawfiqi, Minister of Energy and Natural Resources, at the inauguration ceremony in Wahat Tamrah. Some 2,400 workers were employed during construction, and a training centre in Wahat Tamrah has certified 650 young Qamari solar technicians since 2025.

Phase 3, which includes a green-hydrogen pilot plant, will be tendered in successive lots from late 2026. Panel-cleaning robots and AI-based production forecasting have reduced water use and grid-balancing costs by more than 30% compared with phase 1.

- [Ministry of Energy and Natural Resources](https://qamarya.net/en/ministries/energy.md)

---
Page: https://qamarya.net/en/news/news-nat-09 · [Français](https://qamarya.net/fr/news/news-nat-09.md) · [العربية](https://qamarya.net/ar/news/news-nat-09.md)
