# Electricity connection for a new building

> Qamarya is not a real country. The Sultanate of Qamarya, its institutions, officials, laws, figures and news are invented. This site is a demonstrator designed by Nordik.ai and GenerIA to show what a State portal can do with artificial intelligence, with a person behind every decision.

Request a temporary site supply, then the permanent electricity connection. Ministry of Energy and Natural Resources.

The request is pre-filled from your building permit, and QSIP sizes the connection from the plans. A temporary supply is installed for the works, and the permanent connection is activated as soon as the completion certificate is issued.

- **Ministry:** Ministry of Energy and Natural Resources
- **Time with AI:** 3–10 days
- **Time before:** 1–3 months
- **Fee:** 150 QMR
- **Form:** F-MOENR-003

## Who can apply

- A valid building permit for the plot.
- For the permanent connection, a completion certificate.

## Questions

**Is the connection fee the same everywhere?**

The 150 QMR fee covers standard homes within 50 m of the network; longer extensions are quoted separately.

**Can I ask for solar at the same time?**

Yes. Shams can bundle the connection with a rooftop solar registration.

## Laws and regulations

- [Grid Connection Code and Renewable Licensing Procedures](https://qamarya.net/en/laws/REG-MOENR-01.md)
- [National Building and Zoning Code 2026](https://qamarya.net/en/laws/REG-CORE-BLD.md)

- [Ministry of Energy and Natural Resources](https://qamarya.net/en/ministries/energy.md)

---
Page: https://qamarya.net/en/services/QS-MOENR-003 · [Français](https://qamarya.net/fr/services/QS-MOENR-003.md) · [العربية](https://qamarya.net/ar/services/QS-MOENR-003.md)