# Building extension or renovation permit

> Qamarya is not a real country. The Sultanate of Qamarya, its institutions, officials, laws, figures and news are invented. This site is a demonstrator designed by Nordik.ai and GenerIA to show what a State portal can do with artificial intelligence, with a person behind every decision.

Add a floor, an annex or carry out major structural renovation work. Ministry of Housing and Urban Planning.

Extensions and structural renovations follow the same digital procedure as a new building, with QSIP recalculating the total floor area, coverage ratio and number of floors after the works. Interior works that do not alter the structure or façade only require a simple online declaration.

- **Ministry:** Ministry of Housing and Urban Planning
- **Time with AI:** 1–4 days
- **Time before:** 2–4 months
- **Fee:** 100 QMR
- **Form:** F-MOHU-002

## Who can apply

- The existing building has a valid permit or completion certificate.
- The extension remains within the maximum floors and coverage ratio of the zone.

## Questions

**Do I need a permit to repaint or refit my kitchen?**

No. Non-structural interior works are exempt; only changes to the structure, façade or floor area require a permit.

**How is the fee calculated for an extension?**

Only the additional built area is charged, at 1.5 QMR per m², with a minimum of 100 QMR.

## Laws and regulations

- [National Building and Zoning Code 2026](https://qamarya.net/en/laws/REG-CORE-BLD.md)
- [Resolution on Digital Building Permits and AI-Assisted Plan Review](https://qamarya.net/en/laws/REG-MOHU-01.md)

- [Ministry of Housing and Urban Planning](https://qamarya.net/en/ministries/housing.md)

---
Page: https://qamarya.net/en/services/QS-MOHU-002 · [Français](https://qamarya.net/fr/services/QS-MOHU-002.md) · [العربية](https://qamarya.net/ar/services/QS-MOHU-002.md)
