# Zoning and planning certificate

> Qamarya is not a real country. The Sultanate of Qamarya, its institutions, officials, laws, figures and news are invented. This site is a demonstrator designed by Nordik.ai and GenerIA to show what a State portal can do with artificial intelligence, with a person behind every decision.

Find out what you may build on a plot before buying or designing. Ministry of Housing and Urban Planning.

The certificate states the zone, permitted uses, maximum floors, coverage ratio, minimum setbacks and any protected-area or coastal-buffer constraints applying to a plot. It is generated instantly from the national digital zoning map and remains valid for 12 months.

- **Ministry:** Ministry of Housing and Urban Planning
- **Time with AI:** 5–15 minutes
- **Time before:** 2–4 weeks
- **Fee:** 20 QMR
- **Form:** F-MOHU-004

## Who can apply

- Open to anyone, including prospective buyers who do not own the plot.
- The plot must be identified by its registry number or on the map.

## Questions

**Is the certificate binding?**

Yes. For 12 months, the rules stated in the certificate apply to any permit application for that plot.

**Does it tell me if the plot is in a protected area?**

Yes. Protected areas such as the Rimal Dunes Reserve or Murjan Marine Park and the 50 m coastal buffer are shown explicitly.

## Laws and regulations

- [National Building and Zoning Code 2026](https://qamarya.net/en/laws/REG-CORE-BLD.md)

- [Ministry of Housing and Urban Planning](https://qamarya.net/en/ministries/housing.md)

---
Page: https://qamarya.net/en/services/QS-MOHU-004 · [Français](https://qamarya.net/fr/services/QS-MOHU-004.md) · [العربية](https://qamarya.net/ar/services/QS-MOHU-004.md)
