# Building completion certificate

> Qamarya is not a real country. The Sultanate of Qamarya, its institutions, officials, laws, figures and news are invented. This site is a demonstrator designed by Nordik.ai and GenerIA to show what a State portal can do with artificial intelligence, with a person behind every decision.

Certify that your building matches its permit before occupation and utility connection. Ministry of Housing and Urban Planning.

At the end of the works, an inspector visits the site and compares the building with the approved plans using the permit’s digital model. The certificate is required for permanent electricity and water connections and for registering the building in the National Land Registry.

- **Ministry:** Ministry of Housing and Urban Planning
- **Time with AI:** 3–7 days
- **Time before:** 1–3 months
- **Fee:** 75 QMR
- **Form:** F-MOHU-006

## Who can apply

- A valid building permit has been issued for the works.
- Works are finished, including façades, safety equipment and connections.

## Questions

**What happens if the inspector finds differences?**

Minor differences can be regularised through an amended permit; major ones must be corrected before a new inspection.

**Can I move in before receiving the certificate?**

No. Occupation and permanent utility connections require the completion certificate.

## Laws and regulations

- [National Building and Zoning Code 2026](https://qamarya.net/en/laws/REG-CORE-BLD.md)
- [Resolution on Digital Building Permits and AI-Assisted Plan Review](https://qamarya.net/en/laws/REG-MOHU-01.md)

- [Ministry of Housing and Urban Planning](https://qamarya.net/en/ministries/housing.md)

---
Page: https://qamarya.net/en/services/QS-MOHU-006 · [Français](https://qamarya.net/fr/services/QS-MOHU-006.md) · [العربية](https://qamarya.net/ar/services/QS-MOHU-006.md)
