Sultanate of Qamarya — fictional demo

Residential building permit

Obtain permission to build a new house or residential building on your plot. Ministry of Housing and Urban Planning.

QSIP checks your plans against the zoning rules of your governorate (floors, coverage ratio, setbacks, coastal buffer) and consults the environment and energy authorities in parallel. A licensed officer of the Directorate of Building Control validates the final decision. The fee is 1.5 QMR per m² built, with a minimum of 100 QMR.

Ministry
Ministry of Housing and Urban Planning
Time with AI
2–5 days
Time before
3–6 months
Fee
100 QMR
Form
F-MOHU-001

Who can apply

  • You own the plot or hold a power of attorney from the registered owner.
  • The plot is zoned for residential use in the National Building & Zoning Code 2026.
  • Plans are signed by an architect registered in Qamarya; a structural report is required above two floors.

Questions

Do I need a structural report for a two-storey house?
No. A structural engineering report is only mandatory for buildings above two floors, although it remains recommended.
Can I build close to the beach?
No construction is allowed within the 50 m coastal buffer. QSIP flags this automatically when it reads your site plan.

Laws and regulations