Renewable Energy Licensing Regulation 2026

Defines the authorisation regime for renewable electricity generation according to installed capacity. It simplifies small self-consumption projects and…

Reference
Ministerial Resolution No. 12/2026
Year
2026
Status
in force
Ministry
Ministry of Energy and Natural Resources

Provisions

  • Installations below 1 MW for self-consumption require only registration with the grid operator.
  • Installations from 1 to 50 MW require a generation licence; installations above 50 MW are awarded as concessions by public tender.
  • Every licence or concession application includes a grid connection study.
  • Pre-approved land is available for solar projects in the Rimal Solar Development Zone.
  • The licence fee is 2,000 QMR per MW of installed capacity, with a minimum of 500 QMR.