Renewable Energy Licensing Regulation 2026
Defines the authorisation regime for renewable electricity generation according to installed capacity. It simplifies small self-consumption projects and…
- Reference
- Ministerial Resolution No. 12/2026
- Year
- 2026
- Status
- in force
- Ministry
- Ministry of Energy and Natural Resources
Provisions
- Installations below 1 MW for self-consumption require only registration with the grid operator.
- Installations from 1 to 50 MW require a generation licence; installations above 50 MW are awarded as concessions by public tender.
- Every licence or concession application includes a grid connection study.
- Pre-approved land is available for solar projects in the Rimal Solar Development Zone.
- The licence fee is 2,000 QMR per MW of installed capacity, with a minimum of 500 QMR.