Electricity connection for a new building
Request a temporary site supply, then the permanent electricity connection. Ministry of Energy and Natural Resources.
The request is pre-filled from your building permit, and QSIP sizes the connection from the plans. A temporary supply is installed for the works, and the permanent connection is activated as soon as the completion certificate is issued.
- Ministry
- Ministry of Energy and Natural Resources
- Time with AI
- 3–10 days
- Time before
- 1–3 months
- Fee
- 150 QMR
- Form
- F-MOENR-003
Who can apply
- A valid building permit for the plot.
- For the permanent connection, a completion certificate.
Questions
- Is the connection fee the same everywhere?
- The 150 QMR fee covers standard homes within 50 m of the network; longer extensions are quoted separately.
- Can I ask for solar at the same time?
- Yes. Shams can bundle the connection with a rooftop solar registration.