Request a temporary site supply, then the permanent electricity connection. Ministry of Energy and Natural Resources.

The request is pre-filled from your building permit, and QSIP sizes the connection from the plans. A temporary supply is installed for the works, and the permanent connection is activated as soon as the completion certificate is issued.

Ministry
Ministry of Energy and Natural Resources
Time with AI
3–10 days
Time before
1–3 months
Fee
150 QMR
Form
F-MOENR-003

Who can apply

  • A valid building permit for the plot.
  • For the permanent connection, a completion certificate.

Questions

Is the connection fee the same everywhere?
The 150 QMR fee covers standard homes within 50 m of the network; longer extensions are quoted separately.
Can I ask for solar at the same time?
Yes. Shams can bundle the connection with a rooftop solar registration.