Building extension or renovation permit
Add a floor, an annex or carry out major structural renovation work. Ministry of Housing and Urban Planning.
Extensions and structural renovations follow the same digital procedure as a new building, with QSIP recalculating the total floor area, coverage ratio and number of floors after the works. Interior works that do not alter the structure or façade only require a simple online declaration.
- Ministry
- Ministry of Housing and Urban Planning
- Time with AI
- 1–4 days
- Time before
- 2–4 months
- Fee
- 100 QMR
- Form
- F-MOHU-002
Who can apply
- The existing building has a valid permit or completion certificate.
- The extension remains within the maximum floors and coverage ratio of the zone.
Questions
- Do I need a permit to repaint or refit my kitchen?
- No. Non-structural interior works are exempt; only changes to the structure, façade or floor area require a permit.
- How is the fee calculated for an extension?
- Only the additional built area is charged, at 1.5 QMR per m², with a minimum of 100 QMR.