Road works and right-of-way permit

Authorisation to dig, lay networks or occupy a public road. Ministry of Transport and Infrastructure.

Utilities and contractors declare their works on the national works map, where QSIP detects conflicts with other planned works and existing underground networks. The permit sets the traffic management plan, the reinstatement standard and a guarantee deposit.

Ministry
Ministry of Transport and Infrastructure
Time with AI
2–7 days
Time before
1–3 months
Fee
250 QMR
Form
F-MOTI-005

Who can apply

  • Licensed contractor or utility operator, or a public entity.
  • A safety plan and traffic management plan prepared by a qualified engineer.

Questions

Can emergency repairs start before the permit?
Yes, for gas, water or power leaks, provided the works are declared within 24 hours.
When is the guarantee deposit returned?
After the final inspection confirms the road surface has been properly reinstated.