Irrigation water quota and well licence
Obtain or adjust your farm’s water allocation, or license a new well. Ministry of Water, Agriculture and Environment.
QSIP calculates the quota from the farm area, crops and the water balance of the basin, and proposes treated wastewater where available. New wells are subject to a hydrogeological review and must be fitted with a smart meter.
- Ministry
- Ministry of Water, Agriculture and Environment
- Time with AI
- 2–10 days
- Time before
- 2–6 months
- Fee
- 15 QMR
- Form
- F-MOWAE-002
Who can apply
- Owner or registered tenant of agricultural land.
- A water usage plan showing crops, surface and irrigation method.
Questions
- Can I increase my quota if I switch to drip irrigation?
- Your quota stays the same, but the water saved can be used to extend your cultivated area.
- Do I need a licence for an aflaj share?
- No. Traditional aflaj shares are recorded as they stand; only new wells and pumping require a licence.