Renewable energy generation licence
License a solar or wind plant between 1 and 50 MW and connect it. Ministry of Energy and Natural Resources.
QSIP determines the applicable regime from the capacity (registration below 1 MW, licence from 1 to 50 MW, public tender concession above 50 MW) and the environmental category of the site. The grid connection study, environmental review, land and tax checks run in parallel, and the licence is signed by the Directorate of Renewable Energy. Plots in the Rimal Solar Development Zone are pre-approved, which shortens the procedure.
- Ministry
- Ministry of Energy and Natural Resources
- Time with AI
- 10–20 days
- Time before
- 6–12 months
- Fee
- 500 QMR
- Form
- F-MOENR-001
Who can apply
- Company registered in Qamarya; foreign ownership allowed under the Foreign Direct Investment Law.
- Installed capacity between 1 and 50 MW; above 50 MW, projects are awarded by public tender.
- Proven land rights on the site (title, lease or plot allocated in the Rimal zone).
Questions
- Do I need a full environmental impact assessment?
- Between 1 and 10 MW a Category B preliminary review is enough; above 10 MW, or inside a protected area, a Category A full EIA is required.
- Why build in the Rimal Solar Development Zone?
- Land is pre-approved, environmental pre-screening is done and a high-voltage substation is available, saving several months.